Import from BigPicture
BigPicture users can migrate their existing boxes, scopes, and custom hierarchies into Foundation in a single guided flow. Use this when leaving BigPicture for Foundation without losing the structural work your team has already done.
You’ll need a BigPicture API token for a user who can read the boxes you want to migrate.
Start the wizard
Section titled “Start the wizard”- Open Foundation Home and click Import in the header.
- Choose Import from BigPicture.
- Follow the five-step wizard.
The five steps
Section titled “The five steps”- Connect — select your cloud region and paste a BigPicture API token. Foundation validates it before moving on.
- Select boxes — Foundation lists your boxes with item counts. Tick the ones you want to bring over. One box becomes one Foundation lens by default.
- Configure — for each box, decide what to import:
- Scope and tasks (required).
- Custom hierarchy — BigPicture’s parent-child relationships map to Foundation tree rows.
- Saved views — column configurations.
- Permissions where possible.
- Progress — the import runs as an async job with per-box progress.
- Complete — review the summary with links to each new lens.
What converts cleanly
Section titled “What converts cleanly”- Scope items — Jira issues stay linked by their key.
- Custom items — BigPicture’s non-Jira items become Foundation Flex Items that you can later promote to real Jira issues with Copy to Jira.
- Gantt-friendly fields — start date, due date, and dependencies transfer when present.
- Box-level templates — standard agile box templates map to Foundation’s Agile Hierarchy preset shape.
What doesn’t transfer
Section titled “What doesn’t transfer”- BigPicture Risks and Resources modules (out of scope for Foundation MVP).
- Box-specific permission schemes that don’t match Atlassian users or groups.
- Baselines beyond the current snapshot (Foundation preserves the active baseline only).
Anything skipped is called out in the final summary.
After the import
Section titled “After the import”- Open each new lens and check dates, dependencies, and assignees against the source.
- Re-run or adjust the generated Sync Agents to match how the team plans to refresh the lens.
- Set up sharing so the original box members keep their access.